Town of Firestone eNotification banner
Neighborhood Street Maintenance Projects

Neighborhood Street Maintenance Project Update 

Oak Meadows Boulevard Closure


The paving project in Oak Meadows will require the closure of  Oak Meadows Boulevard from Twilight Avenue south to Firestone Boulevard.  During this time, access into and out of the Firestone Meadows Apartments will be from the emergency access road at Ebony Street, located in the northeast area of the complex.  This full closure will begin at 7:00 a.m. on Thursday, June 20, 2024, and is anticipated to only last one day.

Thank you for your cooperation and patience while this work is completed. For more information on this project, please contact the Town of Firestone at 303-833-3544. 


June 14, 2024 - The mill and overlay projects will begin Monday, June 17, 2024. The neighborhoods impacted by this work include Monarch Estates and Oak Meadows.

Weather permitting, normal work hours will be from 7:00 a.m. to 6:00 p.m., Monday through Friday. Access to residential streets will be limited on certain days. Failure to obey the "NO PARKING" signs could result in vehicles being moved at the owner's expense. 

Motorists are urged to pay close attention while driving through the work area and be prepared for slight delays.  Please abide by all posted traffic control signs, be aware of detours, and reduce speeds in the work zone.

For more information on this project, please contact the Town of Firestone at 303-833-3544. 


May 10, 2024 - Brannan Sand and Gravel is working through the 2024 Neighborhood Street Maintenance projects.  The contractor will start with the crack repairs in Stoneridge, Oak Meadows, and Monarch Estates, then move to the edge mill and overlay project in Monarch Estates and Oak Meadows.

View maps of the work for each neighborhood here:

  • Stoneridge
  • Monarch Estates
  • Oak Meadows 

Weather permitting, regular work hours will be from 7:00 a.m. to 6:00 p.m. Monday through Friday, and the project should be completed within 90 days. 

Residents can expect to receive door hanger notices from the contractor, with specific timing for the work on their street.  


CRACK REPAIR:

  • 300 tons of crack repair will be completed on 2" or larger cracks in the Stoneridge subdivision.
  • 500 tons of crack repair will be completed on 2" or larger cracks in the Oak Meadows subdivision.
  • 500 tons of crack repair will be completed on 2" or larger cracks in the Monarch Estates subdivision.


EDGE MILL AND OVERLAY:

Monarch Estates

  • Sandy Ridge Ave - from Birch St to Barron St
  • Bald Eagle St - from Sandy Ridge Ave to Monarch Dr
  • Silverleaf Ave - from Barron St to cul-de-sac
  • Barron St - from Silverleaf Ave to cul-de-sac
  • Shenandoah Ave - from Silverleaf Ave to cul-de-sac
  • Bedford St - from Monarch Dr to cul-de-sac
  • Monarch Dr - from Bedford St to Bald Eagle St
  • Bailey St - from Monarch Dr to cul-de-sac
  • Belmont St - from Sandy Ridge Ave to cul-de-sac
  • Autumn St - from Silverleaf Ave to cul-de-sac

Oak Meadows

  • Ulysses Ave - from Oak Meadows Blvd down to and including both cul-de-sac's
  • Oak Meadows Blvd - from Firestone Blvd 400' to Trailway Ave
Share on Facebook
Share on Twitter
Share via Email

Copyright © 2024 Town of Firestone. All Rights Reserved.
9950 Park Ave., Firestone, CO 80504

Powered by
CivicSend - A product of CivicPlus